Limestone retaining wall repair tips

Limestone retaining wall construction in Colorado: Why you should split blocks for a rough finish. If the end of a block will be visible, and you’d like it to match the other rough surfaces, use a block splitter. You can probably rent a splitter like this for less than $100 per day. Use a gas-powered cutoff saw like this one for a smooth cut. This saw can cut with or without water. Water eliminates the dust but creates a messy slurry that can permanently stain surfaces like driveways and sidewalks. You can rent a saw like this for about $80 per day. If you don’t use water, make sure the dust doesn’t blow into the house or on a neighbor’s house.

By using NFC you are basically increasing the depth of your retaining wall. Most masonry blocks would be an average depth of 200-250mm, by using NFC you are increasing that depth of your solid masonry block from 200mm up to 500mm (Infill depth) or more depending on the height of your wall. It is always recommended that every third or fourth block should have part of the back edge removed. This would give a far better adhesion tying the NFC infill layer and the NFC core filled blocks creating a far stronger structure.

We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery. Discover additional information at Colorado Retaining Wall Builder.

After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms.

Shorter retaining walls, however, can be constructed by enthusiastic do-it-yourselfers equipped with some basic construction knowledge. Does that sound like you? If you’re looking to get your hands dirty and enhance your landscape with a retaining wall, these guidelines for building a retaining wall will help you get off to a good start. A retaining wall’s effect on the natural flow of water could impact your neighbors, so some communities require homeowners to obtain a permit before construction commences. You may have to submit plans for your wall and schedule a property inspection to ensure that building a retaining wall won’t create drainage problems.